To install a DN800 HDPE stormwater drain (~100 meters) and headwall for discharging stormwater from KKSS into Unnamed Creek.
Scope
Includes excavation, pipe laying, backfill, compaction, headwall installation, scour protection, as-built surveys, and coordination with other contractors on site.
Contractor: Black Hill Group Pty Ltd T/A SPARTACON
Commencement Date: 18 March 2025
Practical Completion Date: 2 May 2025