Stormwater Drain Installation

DN800 Stormwater Drain Installation – Kurri Kurri, NSW As part of the Kurri Kurri Lateral Pipeline (KKLP) Project for APA Group on behalf of Snowy Hydro Limited, this project involved the installation of a 100m DN800 HDPE stormwater drain and headwall at the Kurri Kurri Storage Station. Works included full excavation, pipe laying, backfilling, compaction, headwall installation, scour protection, and as-built surveys—delivered in close coordination with other contractors on site. Keejen provided project engineering support, working alongside the site team to ensure smooth delivery from March to May 2025.
Client
APA Group (on behalf of Snowy Hydro Limited)
Services

Purpose

To install a DN800 HDPE stormwater drain (~100 meters) and headwall for discharging stormwater from KKSS into Unnamed Creek.

Scope

Includes excavation, pipe laying, backfill, compaction, headwall installation, scour protection, as-built surveys, and coordination with other contractors on site.

Contractor: Black Hill Group Pty Ltd T/A SPARTACON

Commencement Date: 18 March 2025

Practical Completion Date: 2 May 2025