DN800 Stormwater Drain Installation – Kurri Kurri, NSW
As part of the Kurri Kurri Lateral Pipeline (KKLP) Project for APA Group on behalf of Snowy Hydro Limited, this project involved the installation of a 100m DN800 HDPE stormwater drain and headwall at the Kurri Kurri Storage Station. Works included full excavation, pipe laying, backfilling, compaction, headwall installation, scour protection, and as-built surveys—delivered in close coordination with other contractors on site. Keejen provided project engineering support, working alongside the site team to ensure smooth delivery from March to May 2025.
Keejen was engaged to support the delivery of the Tamworth Intermodal Freight Facility, a critical piece of infrastructure within the Tamworth Global Gateway Park. This facility enables direct freight transfer from truck to train, creating a vital link between regional New South Wales and international ports via the Port of Newcastle and Port Botany.